This is all coming along fine.
Hallway and bathroom are being done at the same time and it’s causing somewhat of a bottleneck in the house.
Had to do the tub and toilet area in the same day because, well, you know, both of these are used on a constant every day deal.
So far so good though. Wife said that the next one I do should be done one room at a time instead of all at once.
1 1/2 inch furring to the exterior walls in order to accommodate R19 insulation – some new wiring (wiring re-routed in some cases) – double pane windows, and new exterior doors with deadbolts
Clean and tight